ALUDECK SLAB FORMWORK SYSTEM
ALUDECK SLAB FORMWORK SYSTEM
Aludeck formwork. Aluminium frame formwork which’s modular and flexible, thus saving time in slab castings.
INFORMATION
HANDLING
Easy handling of each components, thanks to the lightness of components in high-resistance aluminum
BRAND
Condor Formwork
PRODUCT TYPE
Formwork
QUALITY
Panels’ phenolic plywood ensures a high-quality casting and numerous uses, reducing costs
COLLECTION
Aludeck
PRODUCTION
Made in Italy
MATERIAL
- Steel
- Aluminum
ASSEMBLY
Easy assembly with standard-module
USE
Out door
STANDARD SYSTEMS
Compared with standard systems, this system uses fewer panels and saves time when moving elements
SAFETY
The system is bottom-up assembled and disassembled, thus complying with safety standards; parapets on all the sides significantly reduce risks of falling
POSSIBILITY
Possibility to use steel props (CEP) or aluminum props (ALUCP);
DOWNLOADS
↓ Data sheet
↓ Catalog
PERFORM
Thanks to the drop head, advanced disassembly can be quickly performed and panels and beams can be used again by means of a further supply of the so called “advanced” props. Advanced disassembly allows to saving time by 66%, strongly affecting labor costs of the company
COMPENSATIONS
Wide range of accessories for casting of overhangs (cornices and balconies) and compensations around columns, elevator shafts, stairwells and wall closures.
DETAIL
THE SYSTEM
Slab formwork system made up of modular frame aluminum panels with phenolic plywood covering, aluminum beams and props.
Thanks to their extreme lightness, each component can be handly moved in the construction site, in compliance with safety standards, thus limiting the involvement of the crane.
Being a standard-module system, in the construction site it is not necessary to calculate the distance between props or the inter-axe between beams; this means easy assembly without errors.
Thanks to the drop heads, it is possible to perform early striking and recover panels and beams from the casted floor, leaving only intermediate props.
Primary and secondary beams and panels can be immediately used again (for example on the upper floor) with a new set of props, in order to reduce the amount of provided components and significantly drop down performing time.
This system is suitable for casting any type of slab having downstand beams emerging only in the perimeter of the floorplan.










