Litokol Litocem Mortar

LITOCEM MORTAR

Litokol Litocem Mortar

LITOCEM MORTAR  

Normal-setting fast-drying special hydraulic binder for screeds. Suitable for underfloor heating. For interiors and exteriors.

Litokol Litocem Mortar

INFORMATION

BRAND 

Litokol

PRODUCT TYPE 

Mortar

DETAIL

Special hydraulic binder to be mixed with assorted aggregates with granulometry from 0 to 8 mm and water

PERFORMANCE MIX RATIO

250 kg – Gravel 0/8 mm 1 m3 - Water < 125* l * depending on humidity of aggregates

HOW TO CLEAN EQUIPMENT  

With water when product is fresh. Mechanically when product has set.

Litokol Litocem Mortar

COLLECTION 

Litocem

PRODUCTION 

Made in Italy

MIXING TIME  

5-10 minutes

CONSISTENCY OF MIX  

Wet Earth

APPLICABLE THICKNESSES  

- Maximum thickness : ≤ 150 mm
- Bonded screeds : from 20 to 40 mm
- Floating or unbonded screeds : from 40 to 80 mm

Litokol Litocem Mortar

IDENTIFICATION DATA  

- Appearance : Powder
- Customs code : 38245090
- Shelf life : 12 months in original packaging in a dry place.

MATERIAL 

Cement

USE 

Interior & Exterior

APPEARANCE

Powder

PACKAGING  

20 kg bags - 1,200 kg standard pallet

RESIDUAL HUMIDITY

- Resin agglomerates : 3%
- Wood, PVC, Rubber, Linoleum : 2%
- Ceramic and porcelain tiles : 3%
- Moisture stable natural stones : 3%
- Resin floors : Follow the manufacturer’s instructions
- Type of covering to be installed : Permissible relative ambient humidity

INTENDED USE  

Development of floating or bonded screeds in indoor and outdoor areas, ideal for subsequent installation in a short time.

MIX RATIO

-Litocem 20 kg (1 bag) – Fine gravel 0/8 mm 170 - 210 kg - Water < 10 l (depending on humidity of aggregates)  -Litocem 200 - 300 kg – Fine gravel 0/8 mm 1 m3 - Water < 100- 150 l (depending on humidity of aggregates)

TIME  

- Set to light foot traffic : 12 hours
- Waiting time for installation of natural stones : 48 hours
- Waiting time for installation of ceramic and porcelain tiles : 24 hours
- Waiting time for installation of resilient and wood flooring : 14 days

PH OF MIX  

13

COLOR  

Grey

SUMMARY

Litokol Litocem Mortar
Litokol Litocem Mortar
Litokol Litocem Mortar

SPECIFIC GRAVITY OF MIX 

2.10 kg/dm3

POT LIFE  

Approx. 60 minutes

TEMPERATURE OF USE  

From -30°C to +90°C

APPLICATION TEMPERATURES  

From +5°C to +35°C

Litokol Litocem Mortar

PREPARING THE MIX  

-The mix can be prepared with a cement mixer, horizontal auger mixer or automatic pressure pump such as Turbosol. -Manual mixing using a shovel is not recommended, as this will prevent the proper homogenisation of the mix. -Mix thoroughly for at least 5-10 minutes. -The water must be measured carefully to obtain a mix with a “wet, almost plastic, earth” consistency which, in the compacting and tamping phase, must not create surface water. 

CONSUMPTION  

2 - 2.5 kg/m2 per cm of thickness

SAFETY INFORMATION C

Consult the product safety data sheet, available on request

ADVANTAGES /FEATURES  

-Suitable for the development of floating or bonded screeds in indoor and outdoor areas, ideal for subsequent installation of ceramic and porcelain tiles after 24 hours, natural stones after 2 days, wood, PVC, linoleum, carpet flooring after 4 days -Suitable for interior and exterior applications. -No shrinkage during setting, which prevents cracking phenomena. -Development of screeds with incorporated heating coils without the need for fluidifying additives. -Quickly develops high mechanical strength, setting to light foot traffic in just 12 hours

PERFORMANCE

COMPLIANCEEN 13813CT - C30 - F6
Compressive strength after 28 days≥ 30.0 N/mm2EN 1348
Resistance to humidityExcellentEN 1348
Resistance to solventsExcellentEN 1348
Resistance to oilsExcellentEN 1348
Resistance to acidsLowEN 1348

APPLICATIONS  

-Once the obtained mix has a “wet earth” consistency, level bands must be created and used as a reference to ensure a flat, level surface. The level bands must be created at the same time as the screed. -The mix must be compacted so as to reduce cavities and voids, levelled using a metal ruler rested on the level bands and trowelled to obtain a smooth and closed surface without any rising water.

-Trowelling can be performed with either a manual trowel or single disc machine. -When the pour is interrupted because the works are stopped, iron sections with diameter 5 mm and length approx. 30 cm must be inserted in the thickness of the fresh screed, spaced about 20-30 cm apart. -When casting the concrete, the bonding slurry made of 32.5 or 42.5 cement, water and Idrokol X20, must be applied with a brush to connect the two castings. -Also in this case, check that the slurry has not skinned over before pouring the new mix. -Alternatively, stop the pour near a threshold and create a construction joint for the entire thickness of the screed.

PREPARATION OF SUBSTRATES  

-Along the entire perimeter and in correspondence with any elevations (columns, beams, etc.), Litoside compressible bands must be applied, acting as a perimeter joint. -Alternatively, it is possible to use similarly compressible materials such as expanded polystyrene, cork, etc. with a thickness of 5 mm.

-In the case of floating or unbonded screeds, create a suitable vapour barrier (polyethylene or similar) against rising damp, overlapping the sheets by at least 20 cm and sealing them with adhesive tape, folding them up along the entire perimeter and in the presence of any elevations for the entire thickness of the screed. -Pipework and ducting laid under the screed should be avoided insofar as sudden changes in thickness may cause cracks and subsidence in the screed. -If it cannot be avoided, it is recommended to firmly secure the pipes or ducts and to insert a light hexagonal reinforcing mesh in the part of the screed affected by the crossing.