OVERLAPPING PANEL WALL-MOUNTED
OVERLAPPING PANEL WALL-MOUNTED
VMZINC Overlapping panel is a wall-mounted cladding system made up of horizontal overlapping panels fixed to the substructure using brackets.
The system is designed to be compatible with external insulation. The panels fit easily into each other, making them quick and easy to install.
INFORMATION
BRAND
Vmzinc
THICKNESS
0.7 mm
PRODUCTION
Wall-mounted cladding system
AREAS OF APPLICATION
-Suitable for both renovation projects and new buildings.
-All types of buildings : commercial, public buildings, collective and individual housing.
ADVANTAGES
-Fast and easy installation making it a cost effective solution -Range of components offering a wide variety of all flashing details
COLLECTION
Overlapping
DOWNLOAD
↓ Data Sheet
AESTHETIC
Aesthetic of transverse line of offset joint
A DURABLE NATURAL MATERIAL
VMZINC Overlapping panel is manufactured using rolled copper titanium zinc that complies with European standard EN 988. It is also rot-proof and non-flammable.
A LOW MAINTENANCE MATERIAL
Zinc does not require any particular maintenance. It remains aesthetically harmonious throughout its lifespan.
SUSTAINABLE SOLUTION
Sustainable solution that fits into its environment. Zinc is 100% recyclable. The nuances of VMZINCINC allow an optimized interaction with other materials.
ECONOMIC
Economic in the purchase and in the pose, VMZINC Overlapping panel can be installed with a thermal insulation from the outside to increase performance.
AREAS OF APPLICATION
- All vertical facades (90°).
- In the case of buildings higher than 30 meters, please contact VMZINC.
- Load bearing structure It can consist of : Masonry or reinforced concrete wall, main steel framing.
- Framework : The substructure (not supplied) can be either galvanized steel or aluminum rail.
EASY TO INSTALL
VMZINC Overlapping panel is lightweight and easy to install: the panels fit easily into each other. The panels can be cut easily on-site, without creating any dust.
Installation
INSTALLATION STAPES
-Installation of the framework is prepared by marking out (laser or tracing line) and must correspond to the layout plan provided by the architect. Once the vertical tracing is done, the brackets are fixed. -The centre distance between rafters must not exceed 600 mm on the main building.
OVERLAPPING
Start installing Overlapping panel by installing a perforated base trim to create the entry of the air gap. It is important to ensure the base trim is horizontally aligned because it determines the correct position of the first row of panels
BOTTOM TO TOP
The panels are installed from bottom to top and fit into each other easily with a clicking movement. The panels are fixed onto each rafter using screws or nails.
PANELS
The panels must be handled with care on the trenching knife to avoid deformation.
TRANSVERSE JUNCTIONS
For transverse junctions, a trim splice plate is placed behind one end of the panel.
FILM
The film must be removed quickly in a single movement after completion of installation