Peri Maximo Frame Formwork

MAXIMO Frame formwork

MAXIMO FRAME FORMWORK

The MX anchoring system, developed by PERI, allows the connection tie-rod to be installed by operating from only one side of the formwork.

Peri Maximo Frame Formwork
Peri Maximo Frame Formwork

This significantly speeds up processing times. Therefore, in addition to requiring fewer workers, MAXIMO is much faster to use than common frame formwork.

The innovative anchoring system and the optimization of the number of anchors reduce costs by up to 50%. Thanks to the tie rods positioned in the center of the frame elements, the network of joints and tie rod holes is tidy and regular, both horizontally and vertically.

Peri Maximo Frame Formwork

information

Peri Maximo Frame Formwork

MATERIAL

Aluminum frame

PRODUCT TYPE

Maximo Frame Formwork

BETTER FINISH OF THE CONCRETE

The footprint of the frame elements and the arrangement of the holes of the tie rods are tidy and regular

EFFICIENT

Optimized arrangement of anchor points

BRAND

Peri

HEIGHT

Height of frame elements up to 3.30 m, width up to 2.40 m (standard)

FRAMEWORK

Versatile frame formwork, extremely cost-effective and compatible with TRIO frame formwork

Peri Maximo Frame Formwork

PRESSURE

Allowable pressure of fresh concrete: 80 kN/m2

ROD

With the DW tie rod you can create thicker walls

MXK SHELF SYSTEM

Shelf system for modular service platforms for MAXIMO and TRIO, in widths of 0.90m / 1.20m / 2.40m. Bracket, walking surface and protective grating can be safely pre-assembled on the frame elements lying on the ground.

USE

No closing of unnecessary anchor points: normally, all holes for the passage of the tie rods of the frame elements are used

Peri Maximo Frame Formwork

MXP SERVICE PLATFORMS

The service platform system for operating in maximum safety, compatible with MAXIMO and TRIO frame formwork.

MAXIMO 300 / MAXIMO 360

Height of the frame elements of 3.00 and 3.60 m respectively (with MX 18 anchoring system; not available for rental).

APPROACHES

The BFD vice approaches, aligns and tightens hermetically

SYSTEM

MAXIMO requires up to 40% fewer tie rods than traditional systems

COMPENSATIONS

No closing of unnecessary anchor points: normally, all holes for the passage of the tie rods of the frame elements are used

COATING

Easy cleaning of the frame thanks to their powder coating

FRAME ELEMENTS

The BFD vice allows compensations between the frame elements up to 10 cm

CORROSION PROTECTION

Improved corrosion protection due to the protection of the internal surfaces of the box profiles of the frame

Peri Maximo Frame Formwork

THICKNESS

With the MX tie rod you can create walls with a thickness between 15 cm and 60 cm (wall thickness adjustable on the tie rod)

MXH HEATED PANELS

For colder climates, such as in the Scandinavian countries for example, PERI has developed the MAXIMO MXH heated formwork panels: By combining the MAXIMO frame elements with the heated panels, it is possible to cast concrete even in the presence of the most harsh temperatures. The formwork system can also be used in summer, making it cost-effective.

Peri Maximo Frame Formwork